Pasadena Soft-Story Retrofit Guide

Pasadena uses Ordinance 7345, a city screening form and local seismic design guidelines. The engineer must address each building and provide required structural observation.

What is different about Pasadena, California?

Pasadena’s notice materials make the distinction between program identification and technical determination clear. An owner who believes a building is outside the retrofit requirement must use the city’s formal screening route.

Current local facts to put in the project file

Official factPlanning meaning
Pasadena’s Notice and Order refers owners to Ordinance 7345Use the city order, not a neighboring program
A scope challenge requires a city screening form completed by a qualified California civil or structural engineerA verbal contractor opinion is not the formal route
Condominium plans are required per building, not per unitHOA coordination may be necessary before design and contracting
Each structure on a multi-building property must be assessedDo not assume one parcel result covers every building
The city guidelines require structural observation during constructionEngineer construction-phase scope belongs in the proposal
Pasadena’s online permit center accepts seismic-retrofit submissionsAssign portal and correction responsibility before filing

Pasadena’s notice also gives a documentation route for owners who believe a building was permitted after the city’s applicable cutoff. Use supporting records and the official city contact.

How should the Pasadena deadline be calculated?

Ordinance 7345 sets three years from the Notice to obtain plans and a permit, and seven years to complete construction. A notice served in 2019 therefore reaches its seven-year deadline in 2026. Use the exact service date printed on the building’s Notice and any City-approved extension; do not substitute a general calendar date.

Turn the local record into a work plan

Inventory every building, complete the required screening, develop the design under Pasadena’s guidelines, submit through the permit path and retain the engineer for required observation and closeout.

Which cost and occupied-building assumptions belong in the file?

HOA coordination, multi-building investigation, material verification and structural observation can affect professional fees and schedule. Ask proposals to separate those tasks.

Pasadena Ordinance 7345 requires written notification to current and prospective occupants about the proposed project, expected duration and contractor contact. Preserve proof as required by the city.

Use the 2026 cost guide to separate the cost rows that matter in Pasadena. Then check the occupied-construction guide for the resident, access and utility duties that belong in this proposal.

Questions the Pasadena proposal must resolve

  • Which structures on the parcel are covered by the City record?
  • Who completes the formal engineer screening and any scope challenge?
  • Which HOA, design and structural-observation duties are included?
  • Who handles permit corrections, occupant notice and final records?

List every structure on the property and identify the party able to approve design, contracting and access. Separate the engineer’s screening, design and observation work from City inspection. Before the first call, make a one-page property list. Name each building and its unit count. Add the HOA contact, City notice and current plan set. Mark any missing record. The contractor comparison guide helps compare occupant notice, permit corrections and final records without hiding them inside one service line.

Frequently asked questions

Can one condominium owner order the retrofit alone?

The city notice says plans are required per building, so owners should coordinate through the relevant HOA and obtain appropriate advice.

Is structural observation the same as city inspection?

No. The city guidelines describe professional structural observation, while the permit authority conducts its inspection process. Define both.

What if the property has several buildings?

Assess each building separately and use the city’s record for each structure.

Use the Get a Quote form.

Get a Quote
Independent provider notice: This is an independent planning and referral website, not a contractor, engineering firm, government office or grant administrator. Any business introduced through the site is separate and controls its own assessment, credentials, availability, price, contract and work. The site may receive compensation if an introduction leads to business.